---
title: "WWT Implementation Roadmap — Cubie Trust-Admission Gate"
subtitle: "Master tracker for all WWT-moving-forward deliverables"
date: "2026-05-30"
status: "Active execution"
author: "Centillion AI · TrustFortress.ai"
---

# WWT Implementation Roadmap — Cubie

**Purpose.** Single source of truth for every artifact, code change, document, and operational deliverable required to advance Cubie through the WWT partnership channel — from AI Proving Ground pilot to first paid customer to GA SKU release.

**Status convention:**
- ⬛ Not started
- 🟨 In progress
- ✅ Complete
- 🔒 Blocked (on external dependency)
- 📋 Designed (spec exists, build not started)

---

## Milestone summary

| Phase | Target | Status |
|---|---|---|
| **M0** Whitepaper v1.2.0 PR | 2026-05-29 | ✅ Merged (PR #91, commit 8fcb4ddf) |
| **M1** WWT-engagement artifact pack | 2026-06-15 | 🟨 In progress (this document + 6 sub-deliverables) |
| **M2** AI Proving Ground pilot deployment | 2026-07-15 | ⬛ Awaiting WWT scheduling |
| **M3** Friendly-customer field pilot (TAMU class) | 2026-09-15 | ⬛ |
| **M4** Reference architecture publication | 2026-10-15 | ⬛ |
| **M5** GA SKU release through WWT catalog | 2026-11-30 | ⬛ |

---

## M1 Deliverables (this sprint)

### 1. ATC Deployment Playbook
**File:** `wwt/01_ATC_Deployment_Playbook.md`
**Status:** 🟨 Built this session
**Owner:** Centillion (deploy) + WWT (infrastructure access)
**Dependency:** WWT ATC scheduling slot

Concrete 30-day playbook for the AI Technology Center pilot. Includes container manifest, port assignments, deploy sequence, shadow-mode activation flow, success-criteria measurement.

### 2. Architecture + Sizing Reference
**File:** `wwt/02_Architecture_Sizing_Reference.md`
**Status:** 🟨 Built this session
**Owner:** Centillion (specs) + Intel (silicon validation)

Per-tier sizing matrix: pacemaker (Cortex-M0+) → industrial ECU (M4F) → edge AI (A53/Atom) → datacenter (Xeon SPR) → TDX confidential VM → SmartNIC IPU. Intel cores, generation, throughput target, power envelope, cost class.

### 3. Day-2 Operations Runbook
**File:** `wwt/03_Day2_Operations_Runbook.md`
**Status:** 🟨 Built this session
**Owner:** Centillion (engineering) + WWT (managed-services)

SLA targets, support tier matrix, incident playbook, telemetry pipeline, version upgrade procedure, disaster recovery, key-rotation cadence.

### 4. PoC Metrics + ROI Spreadsheet
**File:** `wwt/04_PoC_Metrics_ROI_Template.md` + `wwt/04_PoC_Metrics_Spreadsheet_Template.csv`
**Status:** 🟨 Built this session
**Owner:** Centillion (metrics design) + Customer (measurement collection)

Measurement framework: GPU utilization, wasted-cycle ratio, energy per useful request, latency overhead, cost per useful request, FAR/FDR. Becomes the customer-deliverable from any pilot.

### 5. AI Gateway Integration Kits
**File:** `wwt/05_AI_Gateway_Integration_Kits.md` + `wwt/integrations/{litellm,portkey,kong}/`
**Status:** 🟨 Built this session
**Owner:** Centillion (FFI layer) + Customer (gateway-config)

Plugin/middleware samples + integration READMEs for LiteLLM, Portkey, Kong AI Gateway. Each customer-installable in ~30 minutes.

### 6. WWT Sales-Enablement Pack (combined PDF)
**File:** `wwt/06_WWT_Sales_Enablement_Pack.pdf`
**Status:** 🟨 Built this session
**Owner:** Centillion + WWT joint

Consolidated PDF bundling: 1-page Cubie pitch + ATC playbook + sizing reference + Day-2 runbook + PoC template — partner-safe (no internal pricing).

---

## M2 Deliverables (next sprint, AI Proving Ground pilot)

| Deliverable | Owner | Note |
|---|---|---|
| ATC infrastructure provisioning | WWT | H100 cluster slot + observability stack access |
| Cubie sidecar deployment | Centillion | Containerized; 30 min provisioning |
| Synthetic traffic mix generation | Centillion | Clean + adversarial + retry-storm; reproducible seed |
| Day 0-7 shadow-mode observation | Joint | No enforcement; collect baseline |
| Day 7-14 active-admit on 5% slice | Joint | Measure deltas |
| Day 14-30 full active-admit + ROI report | Joint | Generate the customer-facing case study |
| Pen-test scoping (Trail of Bits / Cure53) | Centillion | Engagement signed; T-90 from M2 end |

---

## M3 Deliverables (friendly customer)

| Deliverable | Owner | Note |
|---|---|---|
| TAMU-class customer identification | WWT (channel) + Centillion (technical) | Texas A&M is the lead candidate per Q&A §E3 |
| MSA + NDA execution | Legal | Standard ISV-MSP shape |
| Customer-specific shadow-mode protocol | Centillion (instantiate from §3 above) | 14-day baseline |
| Customer ROI measurement | Customer (measurement) + Centillion (analysis) | Use M1 PoC framework |
| WWT case-study draft | WWT marketing + Centillion engineering | Cleared by customer |

---

## M4 Deliverables (reference architecture)

| Deliverable | Owner |
|---|---|
| WWT-Intel co-authored reference architecture | WWT + Intel + Centillion |
| Published whitepaper + companion materials | Joint |
| Trade-show materials (RSAC, WWT Summit) | WWT marketing |
| WWT catalog SKU draft | WWT product mgmt + Centillion |

---

## M5 Deliverables (GA SKU + commercial vehicle)

| Deliverable | Owner |
|---|---|
| WWT catalog SKU live | WWT product mgmt |
| Intel partner-channel listing | Intel partner mgmt + Centillion |
| Support contract templates | Centillion (drafted) + WWT (revised) |
| 3-5 paid customer launch (target Q4) | WWT sales + Centillion |
| Telco vertical expansion launch (M5+1) | WWT telco + Centillion + CAMARA team |
| Cyber Range demo materials | WWT security + Centillion + Naasief Edross |

---

## Cross-cutting concerns

### Compliance & cert path
| Cert | Target | Status |
|---|---|---|
| SOC 2 Type II | M5 | ⬛ |
| ISO 27001 | M5 | ⬛ |
| EU AI Act Article 9/13/14/15 conformity | M4 | 📋 (design in whitepaper, audit not done) |
| IEC 62304 Class C (medical device profile) | M5+ | 📋 |
| Common Criteria EAL 4+ (gov vertical) | M5+ | ⬛ |

### Trust-establishment artifacts (sourced from existing work)
| Artifact | Source | Status |
|---|---|---|
| 81 triple-kernel formal proofs | `proofs/{verus,coq,lean}/` | ✅ CI-enforced |
| `intc-v1.0/` GPU-fleet evidence pack | `demo/evidence/intc-v1.0/` | ✅ committed |
| `cubie-tep-v1.2.0/` formal-detection evidence pack | `Downloads/Cubie_Analysis_2026-05-30/02_*/` | ✅ assembled |
| Whitepaper v1.2.0 (22 pages, page-1 leaderboard) | `docs/whitepaper/v5_cubie_tep_whitepaper.pdf` | ✅ merged via PR #91 |
| Q&A response document (30+ questions) | `Downloads/Cubie_Package_v1.2.0_2026-05-29/` | ✅ delivered |
| `wwt-tech/` 8-doc reference set | `demo/wwt-tech/` | ✅ committed |
| Unified analysis cross-reference | `Downloads/Cubie_Analysis_2026-05-30/01_*.pdf` | ✅ delivered |

### Pen-test / third-party security review
**Engagement:** Trail of Bits **or** Cure53 (decide based on quote + cubie focus area).
**Scope:** the admit-gate primitive + the Intel TDX shim + the dual-ledger seal + the bare-metal Rust runtime.
**Budget envelope:** $80K-$150K, 4-6 weeks elapsed.
**Critical path:** must complete before M5 GA SKU.

### Telco / CAMARA workstream
**Owner:** WWT telco vertical + Centillion (architecture) + CAMARA team.
**Trigger:** request from WWT post-M2.
**Pre-built materials:** the CAMARA MCP Apps + Portal project (`OneDrive/Desktop/camara-mcp-apps`, `OneDrive/Desktop/camara-mcp-portal`) already has API mediation; Cubie integrates as the trust substrate.
**Deliverable:** 1-hour deep-dive session at WWT telco vertical.

### Cyber Range / Naasief Edross workstream
**Owner:** WWT security + Centillion + Naasief Edross.
**Trigger:** request post-M2.
**Pre-built materials:** the `wwt-tech/risk-register.md` covers the adversarial threat model; Cubie's denial taxonomy supports red-team scenarios.
**Deliverable:** Cyber Range live-demo with adversarial AI traffic.

### Intel co-engineering arc
**Owner:** Centillion (architecture) + Intel (silicon + validation).
**Touch-points covered today:**
- Cubie TDX shim (`cubie-tdx-shim`) — SEAMCALL/SEAMRET wired
- Intel ITA v2 attestation handshake — code paths exist in `cubie-control`
- Sapphire Rapids hot path — AVX-512 / AMX paths designed
- Intel PT trace fragment in TDX — bundle wired
- TDX Connect community review submissions — 4 drafts read (cdrdv2 917469-917472)
**Touch-points pending Intel sign-off:**
- Formal validation of the ITA v2 composite-attestation handshake
- Intel partner-channel listing
- Co-branded reference architecture (M4)

---

## Open questions for WWT (to surface in next sync)

1. **ATC scheduling.** When can we get a slot in the AI Technology Center for M2?
2. **Friendly-customer pre-engagement.** Is Texas A&M the right lead, or is there a faster path through a Defense-vertical or healthcare-vertical customer?
3. **Pen-test budget.** Will WWT co-fund or is Centillion solo?
4. **Co-marketing.** What's the WWT process for joint case-study publication?
5. **Channel pricing.** What's WWT's standard ISV pricing/discount band for products like this?

---

## Companion documents (this delivery)

All M1 sub-deliverables ship in this same `wwt/` directory:

- `01_ATC_Deployment_Playbook.md`
- `02_Architecture_Sizing_Reference.md`
- `03_Day2_Operations_Runbook.md`
- `04_PoC_Metrics_ROI_Template.md` + `04_PoC_Metrics_Spreadsheet_Template.csv`
- `05_AI_Gateway_Integration_Kits.md` + `integrations/{litellm,portkey,kong}/`
- `06_WWT_Sales_Enablement_Pack.pdf` (rendered consolidation)

This roadmap is `WWT_Implementation_Roadmap.md` — the index.

---

**Next update:** post-M2 (after first ATC pilot week).
